Items
Search full-text
dining hall
-
C2b-102/10/14: Tunnel to Royal cafe (75) Tunnel to Royal cafe (75). One of a collection of Slides relating to Saltaire compiled by Albert Bowtell. -
C2b-102/10/15: Tunnel to Royal cafe (81) Tunnel to Royal cafe (81). One of a collection of Slides relating to Saltaire compiled by Albert Bowtell. -
C2b-102/3/11: Royal Cafe (80) Royal Cafe (80). One of a collection of Slides relating to Saltaire compiled by Albert Bowtell. -
C2b-102/3/7: Royal Cafe (74) Royal Cafe (74). One of a collection of Slides relating to Saltaire compiled by Albert Bowtell. -
C2b-144: Lower part of Victoria RoadPhotocopy of coloured postcard of lower part of Victoria Road between the Dining Hall and the Mill and bridge - Marked 'Victoria Road, Saltaire'
-
C2b-201a,d: Interior of Cafe, Saltaire Photograph of the 'Interior of Cafe Saltaire, August 1905', probably taken in the Royal Cafe. This is one of two images this shows three men possibly waiters sat at a table in the cafe. -
C2b-201b-c: Interior of Cafe, Saltaire Photograph of the 'Interior of Cafe Saltaire', probably taken in the Royal Cafe. This is one of two images this shows a lady stood by a table with a counter and a member of staff in the background. -
2019.37.1: College Enhancement ProjectA letter from Sheena Vick, Heritage Lottery Fund re. Saltaire Royal Cafe Enhancement Project
-
2019.37.2: College Enhancement ProjectA report from Rance Booth & Smith re. Saltaire Royal Cafe Enhancement Project
-
2019.37.3: College Enhancement ProjectA letter from Heritage Lottery Fund re. Saltaire Royal Cafe Enhancement Project
-
2019.37.4: College Enhancement Project'Guiding Principles for the Redevelopment of the Former Royal Cafe (Mill Building)
-
2020.9.1: A Report on the Condition of the Roof Structure to the Mill Building, Victoria roadA Report on the Condition of the Roof Structure to the Mill Building, Victoria Road,Saltaire for Shipley College. Includes original photographs pasted into the booklet. Produced by Robinson Consulting Engineers
-
2020.9.2.1: Shipley College Mill Building Refurbishment: ProposalsReport and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.2: Shipley College Mill Building Refurbishment: Plans10 copies of plan DRG.No. 97517-4 - A plan of the cross-sections of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.2.1: Shipley College Mill Building Refurbishment: PlansLaminated copy of plan DRG.No. 7517-4 - A plan of the cross-sections of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.3: Shipley College Mill Building Refurbishment: PlansA copy of plan DRG.No. 97517-5 - A plan of the ground floor of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.4: Shipley College Mill Building Refurbishment: PlansA copy of plan DRG.No. 97517-6 - A plan of the First floor and the Mezzanine level of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.5: Shipley College Mill Building Refurbishment: PlansA copy of plan DRG.No. 97517-7 - A plan of the Ground floor of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.6: Shipley College Mill Building Refurbishment: PlansA copy of plan DRG.No. 97517-8 - A plan of the First floor of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
-
2020.9.2.7: Shipley College Mill Building Refurbishment: PlansA copy of plan DRG.No. 97517-9 - A plan of the Existing plan and the Proposed plan of the Lower Ground Floor of the building from: Report and plans for Shipley College Mill Building Refurbishment - Nov. 1997 produced by J.H. Langtry-Langton Partners, Architects and Project Managers
Catalogue data (excluding media) available under Creative Commons Attribution-ShareAlike (CC BY-SA 4.0) licence.